TransPharm Unit
Colchester General Hospital
£0.4M
2015
20 Weeks
790m2
Client
Colchester Hospital University NHS Foundation Trust
Project Manager/Quantity Surveyor
Dudley Smith Partnership Limited
Architect
KLH Architects
Structural Engineer
Haydn Evans Consulting
This project consisted of:
- Internal alterations to allow for the installation of an automated dispensary system.
- Office fit-out.
- Alterations to existing mechanical and electrical services.
- External Carpark.
New suspended ceilings were installed along with new floor coverings.
A phasing plan was drawn up to assist in efficient programming and to minimise disruption to both patients and hospital staff. As the building was occupied, noisy works were undertaken early in the mornings before the staff arrived for work.
Whilst working on this project we were invited to tender for another scheme at the Colchester Hospital, the Cystoscopy and Urology Unit, which we secured and were running both sites at the same time.